An additional two (2) drill holes for approximately 1,188.1 metres (m) were completed during the Summer 2024 Drill Campaign and reported herein.
Drill hole CS24-022 encountered 14 spodumene-pegmatite intervals, with the widest continuous interval of 52.3 m …An additional two (2) drill holes for approximately 1,188.1 metres (m) were completed during the Summer 2024 Drill Campaign and reported herein.
Drill hole CS24-022 encountered 14 spodumene-pegmatite intervals, with the widest continuous interval of 52.3 m … …Read More

By

Leave a Reply